Introduction

The European Union (EU) presented the 'Fit for 55' package to reduce greenhouse gas (GHG) emissions by a minimum of 55% by 2030, boosting the EU's renewable energy target to 40% by 2030 and emphasising the sector coupling of transport, buildings, and industries1. Achieving this ambitious energy transition target depends on the growing integration of renewable-based and sector-coupled energy systems owned by prosumer-driven energy communities (EC)2. The EU highlighted the role of citizen energy communities (CEC) and renewable energy communities (REC) through innovative and proactive consumer participation activities3,4. These energy communities are collectives formed by citizens to produce, manage, and consume their own energy from locally installed renewable assets5. ECs offer advantages such as promoting energy independence, reducing GHG emissions, combating fuel poverty, and stimulating the local economy. Additionally, they empower citizens by providing democratic authority over energy investments, allowing them to become co-owners of renewable installations and participate in the decision-making processes6. ECs are backed by the Renewable Energy Directive, also termed RED II, which encourages active consumer participation in all markets and urges member countries to adopt support schemes7.

Sector coupling offers innovative solutions to the flexibility requirements of energy systems by creating cost- and fuel-efficient strategies via smart integration8. It enables cost-efficient investment decisions, boosts energy infrastructure use, and facilitates new storage opportunities for increased integration of renewable energy sources (RES)8,9. By converting power-to-X (P2X) and creating a system of systems (SoS), sector coupling paves the way for in-depth energy system decarbonization10. The landscape of P2X technologies, which includes power-to-heat (P2H), power-to-gas (P2G), and power-to-vehicle (P2V), is an evolving one to connect diverse energy sectors and thereby solving the intermittent issue of renewables8. The SoS approach connects the ECs, the utility-scale systems, the renewable energy sources (RES), the grid-level systems, and the energy market on a common platform for planning, controlling and optimisation. In the SoS approach, electricity is considered the leading energy carrier, and the power grid becomes central to decarbonising the whole energy system through maximum P2X usage, enabling cross-vector integration of energy resources and improved grid operations management. The SoS approach entails (i) energy optimisation, (ii) decarbonisation, (iii) energy efficiency, (iv) system flexibility and resilience, (v) cost- and fuel-efficient systems, and (iv) infrastructure optimisation11. This holistic integration allows for addressing not only technical issues with renewable energy usage but also challenges in energy security, economics, and environmental impacts11.

Integrating RES-based systems and employing sector coupling amplifies efficient and flexible intra- and inter-community energy exchange, promoting decarbonisation and optimising grid operations, and establishing a community federation controllable through a cloud-based platform12,13. The SoS approach enhances grid resilience, reduces costs, minimises distribution losses, and facilitates the management of peak loads, benefiting energy communities and grid operators11. However, demonstrating clean energy transition scenarios in sector-coupled and renewable-based energy communities presents several challenges. These include formulating appropriate methods that balance multiple motivations, such as integrating diverse RES-relevant technologies effectively, activating flexibility in energy communities, decreasing load, reducing grid dependability, developing viable business cases, and establishing clear validation metrics. Diverse RES technology integration involves complexities such as technology interoperability and effective integration frameworks. For example, Lund et al. (2015) explored hybrid energy systems and the integration of diverse RES technologies in the context of Denmark’s energy system10. Activating flexibility in energy communities is complex due to existing electricity markets, tariffs, and regulations that often hinder effective demand response, load shifting, and energy storage solutions14. Energy communities face grid dependence and load management challenges due to the lack of coordinated control and incentives for customer-owned assets15. The existing literature on energy community business models remains fragmented, lacking a cohesive systematization of community arrangements16. Also, the need for comprehensive validation metrics to measure the performance of smart energy systems has been emphasized by Efkarpidis et al. (2022)17. Challenges include identifying actors, objectives, boundaries, and revenue-generating business cases18,19. Therefore, overcoming these challenges requires a mix of approaches to finalise a set of demonstration scenarios and then elaborate them for detailed characterisation.

Based on these, the authors formulate the following primary research question: How does one effectively address the complexities of demonstrating clean energy transition scenarios in sector-coupled and renewable-based energy communities?

To address the research question, a comprehensive methodology and case study focused on three distant European energy communities is provided. The method consists of two novel approaches described in the Methodology section: firstly, a SoS approach to build an optimised platform integrating multiple energy sectors, and secondly, exploring clean energy transition scenarios to unlock the potential of energy communities. The demonstration scenarios for the project are then presented, highlighting planned actions, and validation strategy. The section after compares the analysed scenarios, evaluating their stakeholders, use case deployment, sector-coupling aspects, impacted markets, a preliminary business model analysis, and challenges and de-risking techniques. Finally, the paper is concluded by discussing the findings, identifying novel insights, and outlining future challenges. The SoS approach optimizes integration across diverse energy sectors, enhancing cost-effectiveness and operational efficiency in future energy systems. Clean energy transition scenarios guide efficient energy use, accelerate renewable adoption, promote low-carbon fuels, optimize energy markets, and improve integrated infrastructure. Energy communities empower local renewable energy generation, promote efficiency, foster community-based storage, enhance grid resilience through decentralized management, and facilitate peer-to-peer energy trading, contributing significantly to sustainability and reducing reliance on centralized systems.

Methods

Based on the SoS strategies in 8, we employ a dual approach to define and analyse the demonstration scenarios. The first approach, the "funnel approach," is used to specify the demo scenarios. On the other hand, the second approach, the "reverse funnel approach," is used to provide a more detailed examination of the demo scenarios.

The funnel approach

In the first phase, we introduce the funnel approach, illustrated in Figure 1, to specify demo scenarios in EC projects. The funnel approach provides a structured method for narrowing down and specifying demonstration scenarios. This approach is closely tied to the SoS method11, which complements it by ensuring a holistic integration of the various subsystems within the EC. In energy systems, the SoS method refers to integrating and coordinating various independent subsystems, such as renewable energy sources, storage solutions, demand-side management tools, and grid infrastructure, into a cohesive and efficient overall system. Each subsystem operates autonomously, but combined with the SoS approach, they achieve broader objectives like enhancing grid reliability, increasing renewable energy penetration, reducing carbon emissions, and improving economic efficiency. While the funnel approach progressively refines and validates scenarios to meet specific project objectives, the SoS method guarantees that these scenarios are coherent and aligned with the broader goals of decarbonisation, flexibility, and economic viability.

c5429e5d-31b9-4a37-9355-74d84e71d1f1_figure1.gif

Figure 1. Funnel Approach to Specify the Demo Scenarios.

The choice of a 4-step funnel approach is driven by the need for a structured and systematic process to refine and validate demonstration scenarios in energy projects. Each step represents a critical phase in narrowing broad concepts into actionable, feasible plans aligning with the overarching project goals. By progressing through these four steps- from scenario development, technology listing, action planning, and finally, validation, this approach ensures that each aspect of the project is thoroughly examined, integrated, and tested.

The broad objectives of such projects include decarbonising the energy system, reducing carbon footprint, enhancing grid reliability, and generating economic benefits. Beginning with defining a set of demo scenarios, we then employ the funnel approach to identify the elements, illustrate action plans, and validate them. Throughout the iterative process, we use the SoS method to ensure a holistic perspective and effective integration of various subsystems within the energy community. This combined approach aims to finalise a feasible set of demonstration scenarios with clear metrics for validation while also considering the development of a viable business case for the pilot sites. The proposed 4-step funnel approach is described below:

  • 1.  At the onset of the funnel approach, first, we propose to develop a preliminary list of demonstration scenarios and constructing feasible business case models. The preliminary list of demonstration scenarios is developed using the SoS approach, prioritising scenarios that best align with the EC’s goals of maximising renewable energy integration, enhancing flexibility, reducing grid dependence, and ensuring economic viability. Each scenario is weighted based on its contribution to these objectives, providing a cohesive and effective set of scenarios for further development. The anticipated business case models underscore a platform-based approach integrating multiple stakeholders through digital platforms, enhancing scale, efficiency, and innovation. These platforms enable flexible, modular services like demand response and electrification, reducing marginal costs and fostering direct interaction between prosumers and service providers. This initial step is crucial as it allows us to focus specifically on these pivotal motivations of energy community projects and tailor the demo scenarios to promote increasing renewable energy integration, improving energy flexibility, reducing grid reliance, and fostering economic viability.

  • (i) To maximise the RES penetration to the existing system in ECs, we recommend integrating diverse energy-efficient state-of-the-art technologies such as P2X, district heating and cooling units (DH&C), combined heat and power plants (CHP), and e-mobility with vehicle-to-grid (V2G) charging infrastructure for bi-directional energy flows. Additionally, we aim to connect RES technologies with storage systems like batteries and pumped hydro, ensuring efficient energy management and use.

  • (ii) Next, we propose actively exploring and implementing opportunities for activating flexibility within the ECs through demand side management (DSM) techniques. We advocate for brainstorming and identifying strategies to effectively deploy demand response (DR) and energy efficiency measures, enabling improved load management. By actively engaging with consumers and promoting energy-conscious behaviours, we can enhance overall system flexibility and ensure the optimal use of RES.

  • (iii) Then, the scenarios should focus on how steps (i) and (ii) can reduce the dependability on the grid network. Reducing dependence on the grid lowers user costs by cutting electricity purchases, as seen with residential solar installations that reduce bills. It also decreases grid investment needs by alleviating strain and maintenance requirements, minimizing the need for costly upgrades.

  • (iv) Finally, the scenarios need to reflect the development of an energy trading platform and market for energy exchange among the EC members and the federation of ECs. This includes disseminating information at the customer level via reports, press releases and workshops to engage the community members in realising the benefits of such projects.

  • 2.  In the second step, all the existing and planned technologies of the project should be listed. Focusing on sector coupling, information needs to be collected on renewable-based electricity production, centralised and decentralised heating and cooling, mobility, hydrogen production, and storage (electricity, heat, and hydrogen). Data is gathered directly from project pilots through detailed asset inventories and technical specifications, ensuring accurate information on system components and energy flows. The energy flows between different sub-pilots or locations should also be analysed in relevant cases.

  • 3.  In the third step, the actions should be planned at different EC levels to implement the demonstration scenarios. At the user level, actions include collecting data from smart meters to optimize energy usage and implementing demand-side management strategies. At the EC level, integration involves developing a cloud platform for analytics and optimizing energy use within a single EC. At the federation level, actions focus on aggregating multiple communities for intercommunity energy exchange and balancing. Detailed examples of these actions can be found in the planned actions section.

  • 4.  The validation of the demonstration scenarios should form the last stage in the funnel approach. A series of key performance indicators (KPIs) can quantify the effectiveness of the planned actions. The KPIs measure the energy system's performance and the energy efficiency actions, grid monitoring, and energy savings and cost savings. The results from the validation must be compared with the project's ultimate set of target metrics.

The reverse funnel approach

After specifying the list of demo scenarios with quantitative KPIs, the demo scenarios are characterised for further analysis. A template has been prepared for structured surveys based on 11 for assessing the demo scenarios in detail. We used the reverse funnel approach, illustrated in Figure 2, to gradually widen the demonstration scenarios from actors via objectives and boundary conditions and finally indicate the preliminary business assumptions.

c5429e5d-31b9-4a37-9355-74d84e71d1f1_figure2.gif

Figure 2. Reverse funnel approach to detail the demonstration scenarios.

The 4-step reverse funnel approach is described below:

  • 1. First, we identified the stakeholder perspective of the scenarios. For example, we categorised the actors from four points of view: (i) System, (ii) TSO, (iii) DSO, and (iv) Investor/Owner. We also identify the proposer/supporter for the scenarios.

  • 2. Second, the scopes of the demonstration scenarios are described, detailing what is in scope and what is out of scope. The location for the scenario deployment, the rationales/key drivers, the sectors to be coupled, the technologies deployed, and the impacted markets are presented. The main rationales listed are decarbonisation, energy optimisation, infrastructure optimisation, and flexibility provision.

  • 3. Third, the main conditions to be in place for realising the demonstration scenarios, commenting on their reasons, expectations, impact, actors/decision makers behind such conditions are listed and described. This step elaborates on ways to de-risk or secure such conditions. In addition, the main regulatory issues impacting and conditioning the feasibility of the demo scenarios are discussed.

  • 4. Finally, the business model presents a short but comprehensive description of value chain flow: who invests, who sells/earns the product/service, who purchases/pays it, if there are pass-throughs or pass-over of costs to other stakeholders, if tariffs (or other regulated economic flows) are involved. The main implicit and explicit assumptions on economic values to be used for assessing feasibility of the scenarios are listed, including the list of externalities (positive or negative); include CO2 role and values. The best alternative(s) to reach the same goal, traditional or other competing innovative solutions, to be used as reference for comparing the economics of the scenarios against such base case are described and quantified. Furthermore, the few main parameters affecting the feasibility of the demonstration scenarios, the need of subsidies; the parameters on which future evolution is expected, are listed, and described.

Specification of demonstration scenarios

To specify the clean energy transition scenarios in sector-coupled and renewable based energy communities, we selected the FEDECOM project pilots: (i) Spanish Virtual Green H2 Federation, (ii) Swiss Residential Hydropower Federation and (iii) BE-NL cross-country e-Mobility Federation. The pilot sites are selected at different geographical locations, with a variety of energy systems and requirements, and stretching across residential, commercial, tertiary, and industrial establishments. This allows the use of P2X technologies and enhances sector coupling opportunities. Table 3.1 presents an overview of the demonstration pilots.

Table 3.1. Overview of the pilots.

Pilot nameCountryFederation memberConsumer Type
Virtual Green H2
Federation
Spain (ES)Ur Beroa Community and Bilbao
Townhall
Residential, Tertiary
Puertollano Green Hydrogen PlantIndustrial
TMB Barcelona StationMobility
Residential Hydropower
Federation
Switzerland (CH)Lugaggia Innovation CommunityResidential, Tertiary
Arena Innovation CommunityResidential, Tertiary
Garamè DistrictResidential
Cross-country
E-Mobility Federation
Belgium
and Netherlands
(BE-NL)
Brussels Brico Retail Community
(BE)
Commercial,
Residential
Voorhout Village (NL)Residential
Besix HQ & Eemnes Community
(NL)
Residential, Tertiary

List of demonstration scenarios

Based on the first two stages of our funnel methodology, we finalised a list of demonstration scenarios, listed in Table 3.2. We classified sets of four sub-scenarios for each of the three selected pilot sites. The sub-scenarios are founded on the energy systems existing at the sites and explore opportunities to fulfil the project goals.

Table 3.2. List of demonstration scenarios.

PilotScenarioSub-scenarioName
Virtual
Green H2
Federation
S1S1aIntegrate renewable energy generation with P2X technology
S1bOptimise integrated operation of DH&C systems
S1cAggregate and unlock flexibility resources across federated
communities
S1dValidate advanced control strategies under effective business models
Residential
Hydropower
Federation
S2S2aIncrease the overall system efficiency through user awareness
mechanisms, thus leading to a reduction in energy consumption (both
thermal and electrical) and to a maximisation of local RES production
S2bIncrease hosting capacity by enabling cross-vector demand-side
flexibility to minimise power congestions and reduce grid investments
S2cEngage members of the energy community in an optimal energy
consumption mechanism at three levels, from the individual user to
the federated level
S2dIntegrate vertical flexibility towards the balancing service providers
in the form of power service by leveraging the assets installed in the
federation
Cross-country
e-Mobility
Federation
S3S3aMaximise exploitation of local RES generation across energy sectors
S3bUnlock demand flexibility by integrating with EV charging
infrastructures
S3cEnable sharing of locally produced energy across community members
S3dDemonstrate cross-country interaction of federated
communities

Technologies

In this section, Table 3.3, Table 3.4, and Table 3.5 provide the list of technologies available at the three pilots sites.

Table 3.3. Pilot 1 – Virtual Green H2 Federation (ES).

Sub-pilot/BuildingCentralised Heating/
Cooling
Decentralised
Heating/
Cooling
Electricity
Production
Public
Mobility
Private
Mobility
Hydrogen
Production
Heat
Storage
Electricity
Storage
Hydrogen
Storage
Coupling
Heating/
Cooling
- Electricity
Bilbao
Townhall
Casa
Consistorial
2 gas boilers17 HP and 168
internal units1
X
San Agustin6 gas boilers and 2
chillers
PVOnly city
council
Linked UPS2X
Aznar2 gas boilers36 HPXLinked UPS3X
Anexo7 HPPVLinked UPS3X
Ur BeroaDistrict Heating, 1
condensing boiler, 2
boilers, 1 biomass boiler,
1 CHP
CHP
PV
XXX
Fertiberia
(Puertollano Green
Hydrogen Plant)
PV 100 MW20 MW
electrolyser
5MW/
20MWh
XX
TMB Barcelonaonly
TMB city
buses
2.5 MW
electrolyser
XX

1 As it is a historic building, the central heating system cannot serve all the spaces and therefore heat pumps were installed. The heat pumps serve either heating or cooling.

2 Same UPS for 3 buildings. They provide flexibility to these buildings (San Agustin, Anexo and Casa consistorial). They are connected with a micro-grid.

3 These boilers give heating services to Casa Consistorial and Anexo buildings.

Table 3.4. Pilot 2 – Residential Hydropower Federation (CH).

Sub-pilotCentralised
Heating/Cooling
Decentralised
Heating/Cooling
Electricity
Production
Public MobilityPrivate
Mobility
Hydro
Storage
Heat
Storage
Electricity
Storage
Coupling
hydro -
electricity
Coupling
Heating/Cooling
- Electricity
Lugaggia
Innovation
Community
(LIC)
14 HP
46 kW
13 Electric boilers
68 kW
PV
85 kW
District battery
50 kW /
60 kWh
X4
Arena
Innovation
Community
(AIC)
District Heating
550 kWth
biomass boiler
2 HP 17 kW

5 Electric boilers
29 kW
PV
30 kWp

PV
22.4 kWp

PV
83 kWp
Q4-2023
DC EV charger
11 kW (V2G)
+ Honda-e 37 kWh
40 m3
thermal tank
(hot water)
District battery5
20 kW / 20 kWh
X4
Garamè
District
(GD)
6 HP 14 kW
3 Electric boilers
10 kW
PV 49 kWpSeasonal
storage6
District battery5
20 kW /
20 kWh
(Q3 2024)
Seasonal
storage6
X4

4 Limited to decentralised heating and cooling systems.

5 Technical specifications to be defined.

6 Seasonal hydro storage (technical and administrative feasibility to be defined with local balancing group).

Table 3.5. Pilot 3 – Cross-country E-Mobility Federation (BE-NL).

Sub-pilotCentralised
Heating/Cooling
Decentralised
Heating/Cooling
Electricity
Production
Public
Mobility
Private
Mobility
Heat
Storage
Electricity
Storage
Coupling
Heating/
Cooling -
Electricity
Brico
Community
(production &
consumption)
& Brico
employees
(consumption)
PVDC
V2G
Voorhout
Community
HP 7.25 kW in
each house
PV 8 kWp in
each house
1 fast
charger
180 kW
(new)
Community
battery 50 kW
/ 50 kWh
X
Eemnes
Community
XPV 86.2 kWpCommunity
battery
Besix HQHVAC system 20
kWe
PV 80 KWp40 EV
V1G 11
kW
80kW/100
kWh
X

Planned actions

After finalising the demonstration scenarios, the next step involves deciding on the actions to be taken. The planned actions are focused at three different interaction levels: User, EC (single community), and Federation (multiple communities). The list of planned actions consists of a wide range of tasks ranging from data collection (e.g., from smart metres) and analysis, integration of energy technologies into a common platform, application of DSM strategies, to development of a business model and a trading platform, optimisation of the dispatch model. Table 3.6 shows the list of planned actions aimed at each of the pilots.

Table 3.6. List of planned actions at three interaction levels.

Interaction levelPlanned Actions
User  ●   Identification of user level stakeholders (e.g., consumer, prosumer)
  ●   Measurement and data collection including user feedback
  ●   Data analytics, forecasting, optimisation, monitoring, and control
  ●   Implement DSM to maximise flexibility (e.g., P2H)
EC  ●   Current system evaluation and future system planning
  ●   Identification of technical and functional requirements of the cloud platform
  ●   Architecture development of cloud platform to facilitate analytical, modelling and optimization
services
  ●   Advanced analytics for optimal control at EC level
  ●   Apply DSM strategies at community level (e.g., district batteries, central HVAC)
  ●   Enable peer-to-peer intra-and inter-community trading to maximise cost benefits
Federation  ●   Virtual aggregation of federated communities focusing on flexibility, energy exchange, and
balancing services
  ●   Apply DSM strategies at federation level (e.g., HV/MV transformer)
  ●   Business model development for enabling inter-community energy trading

Validation strategy

We propose the IPMVP method for validating the demonstration scenarios20. Therefore, the following list of key performance indicators (KPI) are suggested.

  • 1) Energy Savings – Energy savings is an indicator of the energy usage reduction after the integration of RES at the demo sites. The FEDECOM project has a set target of achieving a minimum of 20% in energy savings after optimisation has been carried out. Equation (1) has been formulated to calculate energy savings for the project21.

Esavings=(Ebaseline−Ereporting)±AdjustmentsEbaseline,adjusted×100%(1)
  • where, Ebaseline and Ereporting are the energy demands in baseline and reporting periods, respectively, and Adjustments are a restatement of the energy demand of the baseline and reporting periods under a common set of conditions.

  • 2) Cost Savings – Cost savings or energy cost reduction translates the amount of energy savings into economic terms21.

Esavings,cost={(Ebaseline−Ereporting)±Adjustments}×Eprice(2)
  • where, Eprice is the energy price per unit at the local market.

  • 3) Asset Revenue – Asset revenue accounts for the revenue from trading between the EC and the grid at the EC level.

Eexport=ERES,prod−ERES,cons−Estored(3)

Revenue=Eexport×Tariff(4)
  • where, ERES,prod and ERES,cons are amounts of locally produced and consume energy, Estored is the amount of locally generated energy stored in batteries, Eexport is the amount of locally generated energy that is exported, and Tariff is the unit price set by the market.

  • 4) Self-sufficiency – Self-sufficiency quantifies how much of the total energy consumption is met by the local RES and is a measure of the level of grid independence22.

SSRES=ERES,consDemandtotal×100%(5)
  • where, Demandtotal represents the total energy demand.

  • 5) Self-consumption – Self-consumption indicates how much of the generated energy from the local RES is consumed at the site22.

SCRES=ERES,consERES,prod×100%(6)
  • 6) Avoided CO2 Emissions – FEDECOM targets a reduction of at least 55% in GHG emissions. The calculation is based on the energy savings during a set observed period and compared with the CO2 emissions for the baseline period23.

CO2reduction=(Demandgrid,old−Demandgrid,new)×EFgrid+(Demandfuel,old−Demandfuel,new)×EFfuel(7)
  • where, Demandgrid [kWh] is the electricity demand from the grid during baseline period (Demandgrid,old) and observed period (Demandgrid,new), Demandfuel [kg] is the fuel demand for heating during baseline period (Demandfuel,old) and observed period (Demandfuel,new), EFgrid [kgCO2/kWh] is the emission factor of the local electricity mix, and EFfuel [kgCO2/kg] is the emission factor of fuel consumed for heating.

  • 7) Peak Shaving – Peak shaving determines a decrease in the maximum electrical or thermal load compared between the baseline and reporting periods23.

PeakShaving=Pold,max−Pnew,maxPold,max×100%(8)
  • where, Pold,max [kW] and Pnew,max [kW] are the maximum load demands in baseline and reporting periods, respectively.

  • 8) Predictability of PV Production and Electricity Demand – These measure the accuracy level in forecasting the level of PV production from the locally installed system and the electrical load demand.

PAx=EforecastedErealtime×100%(9)
  • where, Eforecasted [kWh] and Erealtime [kWh] are estimated and actual levels of PV production/load demand in the observed period, respectively.

  • 9) Grid Operating Margin – Grid operation margin expresses the profitability of a grid operator by considering the electricity sales revenue and the grid operating expenses.

Gridop,margin=OperatingexpensesRevenue(10)
  • where, Operating expenses [€] are costs incurred in running the grid and Revenue [€] is earned from the sale of electricity.

  • 10) Grid Forecasting Offset – Grid forecasting offset measures the accuracy of the forecasting system in place at a grid operator. The normalised Mean Absolute Error (NMAE) can be used as the metric for the grid forecasting offset.

NMAE=1n×∑|Forecasti−Actuali|Meanactual(11)
  • where, n is the number of forecasts, Forecasti is the forecasted value of the voltage for time i, Actuali is the actual value of the voltage for time i, and Meanactual is the mean of the actual values.

  • 11) Grid State Estimation – Grid state estimation is essential in obtaining the electricity grid's real-time state. For this measurement, a Skill Score to compare the performance of the proposed method to a 'zero hold' method can be used.

SkillScore=1−RMSEproposedRMSEhold(12)
  • where, RMSEproposed and RMSEhold are the Root Mean Squared Errors of the proposed, and the ‘zero hold’ method, respectively.

  • 12) Grid Electricity Usage Reduction – Grid electricity usage reduction measures the reduced electricity drawn from the grid.

Egrid,reduced=Demandgrid,old−Demandgrid,new(13)
  • where, Demandgrid [kWh] is the electricity demand from the grid during baseline period (Demandgrid,old) and observed period (Demandgrid,new).

  • 13) Grid CAPEX and OPEX Reduction – Grid CAPEX and OPEX reduction quantifies the savings after the implementation of the project.

CAPEXgrid,reduced=CAPEXgrid,old−CAPEXgrid,newCAPEXgrid,old×100%(14)
OPEXgrid,reduced=OPEXgrid,old−OPEXgrid,newOPEXgrid,old×100%(15)
  • where, CAPEXgrid [€] is the capital expenditures during baseline period (CAPEXgrid,old) and observed period (CAPEXgrid,new) and OPEXgrid [€] is the operating expenses during baseline period (OPEXgrid,old) and observed period (OPEXgrid,new).

Detailing the demonstration scenarios

Actors/stakeholders

For the FEDECOM project, the identified actors or stakeholders are classified as shown in Table 4.1.

Table 4.1. List of actors/stakeholders.

PilotEntitySystem/
Technical
Enabler
TSODSOInvestor/
Owner
Energy
Network
Energy
Supply Chain
1Ur Beroa Community and
Bilbao Townhall
---Yes-Yes
Puertollano Green Hydrogen
Plant
Yes--YesYesYes
TMB Barcelona StationYes--YesYesYes
2Residential Hydropower
Federation
--YesYesYes-
3Cross-country E-Mobility
Federation
Yes-----

Sector coupling

Each of the sub-pilots’ experience interaction of a variety of energy resources. The sectors coupled are presented in Table 4.2

Table 4.2. Overview of the sectors coupled at the pilot sites.

PilotTechnologiesMain Focus
Ur Beroa CommunityPV production, H2 generationRenewable energy integration, Substituting
gas with H2
Bilbao TownhallGas and electric vectorsOptimising thermal management
Puertollano Green Hydrogen PlantIndustrial sector, Green
hydrogen
Hydrogen supply to the industrial sector
TMB Barcelona StationMobility sector, Hydrogen supplyHydrogen supply for mobility and industrial
sectors
Residential Hydropower FederationThermal, electricity, EV sectorsIntegration across multiple sectors
Cross-country E-Mobility FederationThermal, electricity, EV sectorsIntegration across multiple sectors

Impacted markets

Table 4.3 overviews different impacted markets for the FEDECOM pilot sites. These markets are impacted because the ECs at each pilot site interacts with various market mechanisms through its load and installed generation capacity, affecting energy trading, balancing, and flexibility services. However, the degree of impact can vary: for instance, smaller pilots (in terms of comparatively smaller generation capacities) may have limited influence on broader markets compared to large-scale projects. Regulatory issues include ensuring compliance with market rules and participating in market platforms. Regulatory frameworks must support integrating these pilot projects into existing markets, addressing aspects such as access, data sharing, and the fair treatment of different market participants.

Table 4.3. Overview of the impacted markets at the pilot sites.

PilotMedium
Voltage
Low Voltage
Day Ahead
Energy Market
Day Ahead
Balancing
Market
Intraday
Energy
Market
Intraday
Balancing
Market
Flexibility
Market
Capacity
Market
Ancillary
Services
Market
Ur Beroa Community
and Bilbao Townhall
YesYesYesYesYesYes--
Puertollano Green
Hydrogen Plant
YesYesYesYesYesYes--
TMB Barcelona StationYesYesYesYesYesYes--
Residential Hydropower
Federation
YesYesYesYesYesYes--
Cross-country E-Mobility
Federation
-YesYesYesYesYesYesYes

Business model analysis

Pilot 1: Virtual Green H2 Federation (ES). Ur Beroa Community and Bilbao Townhall are managed by the R&D department of GIROA S.A. (member of VEOLIA Group), which is an energy and environment management services company The aims and objectives of the FEDECOM project match GIROA’s Energy Service Companies (ESCO) contracts and Energy Performance Contracting (EPC) commitments to implement RES, optimise energy efficiency and advanced systems management. Scenarios S1a and S1b align with GIROA’s EPC obligations of helping its customers shift to RES, and enable energy and cost savings, respectively. As per the demo scenarios, GIROA shares energy and cost savings with its customers, which incentivizes DH&C optimization strategies. The FEDECOM project offers extra value and an edge over its competitors for analysing, tracking and operating installations. The company also aims to transition the installations towards predictive control systems.

The list of manufacturers of the small electrolysers required for Ur Beroa is small and the issue is compounded by high demands and long delivery times due to present supply chain challenges. The operations of upgrading the installations at Bilbao Townhall is restricted by the active use of the buildings but this can be bypassed by working outside the active office hours. Pilots P1b and P1c are both impacted by external conditions of hydrogen demand from the fertiliser company and the captive bus fleet, the fertiliser company consumption profile, the bus refuelling window, and the electricity price.

The business model for Ur Beroa encompasses a reduction in gas consumption by the CHP unit and thus resulting in cost savings. During low heating demand periods, the PV generated electricity can feed into the local energy market. The optimised thermal service at Bilbao also results in energy and cost savings, raising the economic efficiency of the contracts. The business model for Puertollano is made up of the Iberdrola company and the Fertiberia company. At TMB Barcelona Station, business is between Iberdrola and TMB. The Iberdrola company is in the charge of the hydrogen production facility and the hydrogen refuelling stations at P1b and P1c, respectively. Fertiberia runs the fertiliser plant and purchases hydrogen from Iberdrola. Similarly, Iberdrola supplies hydrogen to TMB for its refuelling stations.

Pilot 2: Residential Hydropower Federation (CH). Azienda Elettrica di Massagno (AEM), along with other partners in the FEDECOM consortium, supports and manages the ECs in P2. Present conditions at the pilot sites are conducive for demo scenarios S2a and S2b. Smart metres are already installed at the end-user level. A communication infrastructure for data collection is in place. At the user level, there is interest in using the FEDECOM tools and also interest in being involved in DSM techniques.

There are a few regulatory issues affecting P2. Swiss law does not permit the creation of virtual energy communities within the national borders and allows only one point of delivery between the energy community and the DSO24. Additionally, the law does not permit energy trading between different energy communities. The setting up of an energy community entails the use of a local and private distribution network for energy trading.

The business case for the Swiss Case is categorically defined for the demo scenarios. In S2a, the asset owner or final user has a leading role in the business model. The user will be informed about the performance metrics and improvement aspects of its assets. This information will be disseminated by the energy community owner through the FEDECOM tools/services. The user is then responsible for further actions in order to improve the efficiency of its assets. Through the implementation of DSM techniques within S2b, the local flexibility will be utilised to improve the hosting capacity of the distribution infrastructure. Consequently, this will play a key role in mitigating congestion and overvoltage events, as well as reducing the necessity for grid investments. The model for S2c encourages local energy consumption and energy exchange at the intra-community level first, and then at the inter-community level, with a final and most expensive option being energy purchase from external retailers. In S2d, the local flexibility available to each user, is aggregated at the federal level to be offered to the local DSO or on the local balancing market. This service is intended to facilitate the participation of small renewable assets, such as heat pumps or batteries, in these markets. The remuneration obtained from these services will facilitate the amortisation of the initial investment made by each asset owner.

Pilot 3: Cross-country E-Mobility Federation (BE-NL). The establishment of S3a is dependent upon the funding scheme as the PV infrastructure and the EV charging network is being privately funded by Brico and additional funding may be required. There is also a need to draw up favourable government regulations and policies for this pilot. The S3b scenario requires active participation and engagement from the consumers for adoption of the RES technologies. Successful implementation of the demo scenarios calls for integrated action from all the relevant stakeholders with plans covering goals, timelines, milestones, risk management, contingencies, and funding.

A regulatory issue impacting P3 consists of requiring necessary permits and approvals from local authorities and regulatory bodies for installing the RES infrastructure. Setting up connections between the different systems and between the local energy communities and the grid is challenging and can necessitate approval from grid operators and regulatory bodies. Furthermore, regulations regarding net metering and feed-in tariffs, energy storage and demand response, privacy and data protection, and safety and liability will need to be considered and complied with.

Challenges

The pilots are bounded by a set of external conditions and their implementation at the pilots brings forth a set of challenges, unique and specific to each of the scenarios. These external conditions and challenges are identified from the survey responses of the pilot leaders.

Bottlenecks affecting scenarios 1a, 1b, and 1c at the Ur Beroa Community are the limited number of manufacturers for small electrolysers that meet the requirements of the planned installations and the consequent long delivery times. These can delay the installation of the proton exchange membrane (PEM) electrolyser at the site; however, the risks can be reduced by contacting the manufacturer of choice early to guarantee delivery according to the planned project timeline. The buildings of the Bilbao Townhall are actively in use, resulting in limitations in upgrading the installations and hampering the comfort level of the users. There are also constraints in budget and space. Testing and upgrading of the tasks can be done outside office hours. Scenario 1d at the Ur Beroa Community and Bilbao Townhall is contingent upon the regulatory issues of installing the hydrogen supply pipe with the thermal management of the community dependent on gas prices. Scenarios for the Puertollano Plant are dependent upon the hydrogen demand from the fertiliser company, the consumption profile, and the electricity price. Scenario 1c requires optimised operation of the battery storage system with the large-scale solar production unit to meet the plant’s electricity demand. De-risking can be done by having a fixed demand and consumption profile from the fertiliser company while for scenario 1d, de-risking can be achieved by establishing a Power Purchase Agreement (PPA) at a competitive price between the Puertollano Plant and the local fertiliser company. Scenarios for the TMB Barcelona Station are dependent upon the hydrogen demand from the fleet of buses, the refuelling window, and the electricity price. These external conditions can be managed by having a fixed demand and fixed fuelling window for the bus fleet. The incorporation of the hydrogen storage tanks into the refuelling station can mitigate the challenges of scenario 1c. Additionally, de-risking for scenario 1d calls for setting up PPAs at competitive prices: one between Iberdrola and the DSO for buying electricity for the hydrogen production system and one between Iberdrola and the TMB Barcelona Station for the selling of hydrogen for the bus fleet.

The external conditions at pilots 2 and 3 are categorised based on the sub-scenarios. Scenario 2a is dependent on participation of a large number of end-users, installation of smart metres and a communication infrastructure between the metres and the FEDECOM platform. Successful operation of scenario 2b calls for setting up of devices that are suitable for demand side management and also requires user willingness to participate. Scenario 2c requires suitable regulations for the energy exchange market and attractive prices to promote exchange. Updating the market rules for ancillary services and providing incentives for communities, with surplus energy production, to increase participation in the ancillary services market is key for scenario 2d. The de-risking strategies here involve making the digital tools readily available, leveraging smart metres and existing communication infrastructures to gather data and enable efficient energy management, introducing incentive mechanisms, and urging users in actively shaping their energy consumption. Additionally, attractive pricing structures, complemented by price caps and suitable regulations, are to be implemented to stimulate energy exchange within local and federation markets. Market rules are to be regularly updated to incentivize participation in ancillary services markets, while surplus energy production is supported through dedicated mechanisms. These collective efforts aim to enhance energy efficiency, reduce consumption, and foster a sustainable residential energy ecosystem.

Scenario 3a is subject to private funding currently, and additional funding may be called for in the future. There is also a need for government policies and regulations that are favourable to the pilot. Scenario 3b requires active participation and engagement from the consumers, energy storage to ensure stable and reliable performance, and advanced energy management systems for managing and optimising the flow of energy. Implementation of scenario 3c is dependent on adequate grid and IT infrastructure to facilitate the transfer of energy and support the communication and data transfer between the various actors, respectively. Scenario 3d is contingent upon regulatory frameworks permitting inter-community energy trading, ensuring interconnections between communities, and setting up a tariff structure for energy exchange. To secure these conditions, a comprehensive plan and strategy should be developed, involving all relevant stakeholders and actors, including government, industry, and consumers. This plan should include clear goals, timelines, and milestones, as well as risk management and contingency plans to address any potential challenges or obstacles. In addition, collaboration and partnerships between various actors and stakeholders can help to secure funding and resources, as well as promote the adoption and implementation of the UC.

The implementation of clean energy scenarios in the pilots brings with it diverse challenges such as availability of installation units, regulatory hurdles, existing market rules, and user interest to participate. Mitigating these challenges involve strategies of early planning and engagement with suppliers and drawing up PPAs for favourable terms and prices. In addition, utilising digital tools, smart meters, and existing grid infrastructure, while encouraging user participation through incentive mechanisms and feed-in tariffs, play a pivotal role in a successful operation of energy communities. Advancing the clean energy transition requires for a multi-sectoral approach in planning, collaboration and building up regulatory frameworks.

Conclusions

Novelties

The paper provided two approaches to define, analyse, and validate demonstration scenarios for energy community projects systematically and comprehensively. The novelties are listed below:

  • 1. The paper presents a 4-step funnel approach that can be used to specify demonstration scenarios in energy community projects, focusing on maximising renewable energy integration, enhancing flexibility, reducing grid reliance, and fostering economic viability.

  • 2. The paper presents a 4-step reverse funnel approach that can be used to detail the demonstration scenarios, considering stakeholder perspectives, scopes, conditions, and business models.

  • 3. The paper exemplified the approaches for three pilots of multiple energy communities.

  • 4. The paper also suggested thirteen KPIs for validating renewable-focused energy community projects.

Limitations and recommendations

We identified four limitations for the described approaches. First, the approaches simplified the complex real-world energy community projects. The interaction between distant communities to make a federation is crucial and should be considered as realistically as possible. Second, although we have specified and detailed the demonstration scenarios in a general manner, it is possible that the application of the approaches is not universal, especially in the case of communities with different characteristics. Third, the methodology relies heavily on data collection and analysis, which is a big challenge, especially in energy communities where multiple stakeholders are engaged. Finally, policy changes, technology uncertainties, business model sustainability, and market dynamics may heavily impact the methodology.

Therefore, we recommend four steps for a better demonstration. First, increase collaboration between energy communities and encourage knowledge sharing of different projects. The engagement of all stakeholders is an absolute necessity. Second, applying these approaches to energy community projects with diverse characteristics will lead to broader adoption. Third, the data collection and analysis process should be transparent and robust. Finally, continuous feedback and improvement of the method could decrease policy, technology, business, and market uncertainties.

In summary, the paper proposes a novel and comprehensive methodology with case studies focused on three distant European energy communities. However, several limitations are also identified, which should be considered for continuous improvement.

Data availability

Zenodo: Template and Results of Demo Scenarios Analysis Survey https://doi.org/10.5281/zenodo.1003953225

This project contains the following underlying data:

  • Survey_Results_Pilots_1_2_3.pdf (Results of the Demo Scenario Analysis for each of the FEDECOM project pilot sites)

  • Demo Scenario Analysis Main Template.pdf

Data are available under the terms of the Creative Commons Attribution 4.0 International license (CC-BY 4.0).

Acknowledgement

The authors would like to thank the European Commission, and all the FEDECOM project partners for the ongoing support to the authors.

References

  • 1.  European Commission: Fit for 55. 2022; (Accessed 15 September 2023). Reference Source
  • 2.  Lowitzsch J, Hoicka CE, van Tulder FJ: Renewable energy communities under the 2019 European Clean Energy Package - Governance model for the energy clusters of the future? Renew Sustain Energy Rev. 2020; 122: 109489. Publisher Full Text
  • 3.  DENA: Energy Communities: Beschleuniger der dezentralen Energiewende. (In German). 2022; (Accessed 15 September 2023). Reference Source
  • 4.  European Commission: Energy communities. 2023; (Accessed 15 September 2023). Reference Source
  • 5.  European Commission: Rural Energy Community Advisory Hub. What is an energy community? (Accessed 21 August 2024). Reference Source
  • 6.  European Commission: Energy communities - Benefits. 2023; (Accessed 15 September 2023). Reference Source
  • 7.  Directive (EU) 2019/944 of the European Parliament and of the Council of 5 June 2019 on common rules for the internal market for electricity and amending Directive 2012/27/EU (2019). (Accessed 21 August 2024). Reference Source
  • 8.  Ramsebner J, Haas R, Ajanovic A, et al.: The sector coupling concept: a critical review. Wiley Interdiscip Rev Energy Environ. 2021; 10(4): e396. Publisher Full Text
  • 9.  Brown T, Schlachtberger D, Kies A, et al.: Synergies of sector coupling and transmission reinforcement in a cost-optimised, highly renewable European energy system. Energy. 2018; 160: 720–739. Publisher Full Text
  • 10.  Lund PD, Lindgren J, Mikkola J, et al.: Review of energy system flexibility measures to enable high levels of variable renewable electricity. Renew Sustain Energy Rev. 2015; 45: 785–807. Publisher Full Text
  • 11.  ETIP SNET: Smart Sector Integration, towards EU System of Systems: Building blocks, enablers, architectures, regulatory barriers, economic assessment (Position Paper). 2021; (Accessed 15 September 2023). Reference Source
  • 12.  EU H2020 REACT Project: What is REACT? 2020; (Accessed 15 September 2023). Reference Source
  • 13.  Hive Power: Lugaggia Innovation Community. 2023; (Accessed 15 September 2023). Reference Source
  • 14.  Ponnaganti P, Sinha R, Pillai JR, et al.: Flexibility provisions through local energy communities: a review. Next Energy. 2023; 1(2): 100022. Publisher Full Text
  • 15.  Sudhoff R, Derzbach R, Schreck S, et al.: On the operation and implications of grid-interactive renewable energy communities. Sustainable Energy, Grids and Networks. 2024; 38(12): 101390. Publisher Full Text
  • 16.  Reis IF, Gonçalves I, Lopes MA, et al.: Business models for energy communities: a review of key issues and trends. Renew Sustain Energy Rev. 2021; 144(6): 111013. Publisher Full Text
  • 17.  Efkarpidis N, Goranović A, Yang CW, et al.: A generic framework for the definition of key performance indicators for smart energy systems at different scales. Energies. 2022; 15(4): 1289. Publisher Full Text
  • 18.  Lazdins R, Mutule A, Zalostiba D: PV energy communities—challenges and barriers from a consumer perspective: a literature review. Energies. 2021; 14(16): 4873. Publisher Full Text
  • 19.  Inês C, Guilherme PL, Esther MG, et al.: Regulatory challenges and opportunities for collective renewable energy prosumers in the EU. Energy Policy. 2020; 138: 111212. Publisher Full Text
  • 20.  EVO: International Performance Measurement and Verification Protocol (IPMVP). 2022; (Accessed 15 September 2023). Reference Source
  • 21.  EU H2020 REACT Project: Deliverable D7.1 REACT validation methodology. 2022; (Accessed 15 September 2023). Reference Source
  • 22.  Ciocia A, Amato A, Di Leo P, et al.: Self-Consumption and Self-Sufficiency in Photovoltaic Systems: Effect of Grid Limitation and Storage Installation. Energies. 2021; 14(6): 1591. Publisher Full Text
  • 23.  EU H2020 DELTA Project: Deliverable D1.4 Performance Measurement & Verification Methodology report. 2019; (Accessed 15 September 2023). Reference Source
  • 24.  Frieden D, Tuerk A, Neumann C, et al.: Collective self- consumption and energy communities: Trends and challenges in the transposition of the EU framework. COMPILE, Graz, Austria, 2020. Reference Source
  • 25.  Maruf MNI, Mahmud S, Pasarín IS, et al.: Template and Results of Demo Scenarios Analysis Survey. [Data set] Zenodo. 2023. http://www.doi.org/10.5281/zenodo.10039532